Our Project List
Commercial >>>
Multipurpose facility with meeting, activity, dining and kitchen areas for senior living community
Senior living apartment facilities in the heart of Fairbanks
103 room hotel facility constructed in 2016
80 Room hotel facility on the Chena River constructed in 2010
Modern Dental clinic in North Pole, completed in 2019
K-8 Alternative charter school constructed in 2009, with an emphasis on outdoor learning and activity
K-8 Alternative charter school under the Waldorf education system, remodeled in 2017
K-8 Alternative charter school in North Pole, constructed in 2019 with an emphasis on outdoor learning and activity
Gas station, convenience store liquor stores for Gavora Inc. HVAC LLC designed and installed a highly efficient ventilation and heating system that reclaims all waste heat from the coolers and freezers.
Healthcare >>>
90,000 sqft health center for Tanana Chiefs Conference, completed in 2013. They provide comprehensive outpatient services to beneficiaries in Interior Alaska
30,000 sqft Medical and office building completed n 2012.
Added redundancy and energy efficiency to existing equipment at end of life serving South Tower of Hospital. Completed 2019
New MRI machine installation at Fort Wainwright Basset Army Hospital. Completed in 2012
Radiology and imaging suite with MRI and CT Scanner at the Fairbanks Surgery Center. Completed in 2011
Remodeled existing building to create Primary Care Medical Home for Fort Greely
Industrial >>>
50,000 sqft industrial shop, warehouse and showroom for NC Machinery, completed in 2012
45,000 sqft industrial shop and showroom for Airport Equipment rentals and John Deere Dealership, completed in 2008
Added industrial ventilation and filtration system for 25,000 sqft welding shop
Replaced existing HVAC system in existing lab and sampling facility at Fort Knox Gold Mine
Construction completed in 2015 for new booster pump station serving Walter Creek Leach Pad at Fort Knox Gold Mine
50,000 sqft multi purpose facility for the Fairbanks International Airport. Includes Fire station, EMS, Industrial shop space, security and Dispatch. Included FAVERS system for 4 fire truck bays
Military >>>
HVAC renovation and vehicle exhaust upgrade of 25,000 sqft Maintenance facility for the Stryker Brigade Combat Team
HVAC renovation and vehicle exhaust upgrade of 85,000 sqft Maintenance facility
HVAC renovation and vehicle exhaust upgrade of 35,000 sqft Maintenance facility for the Stryker Brigade Combat Team
HVAC renovation and vehicle exhaust upgrade of 35,000 sqft Maintenance facility for the Stryker Brigade Combat Team
HVAC renovation and vehicle exhaust upgrade of 17,000 sqft Maintenance facility for the Stryker Brigade Combat Team
Installed FAVERS (Fire Apparatus Vehicle Exhaust Removal System) to fire station with 4 bays
Large multi use warehouse facility renovation. We utilized industrial fabric ductwork to keep the project within budget.
HVAC renovation and vehicle exhaust upgrade of auto repair shop and learning center for military personnel
New construction of Field Training Detachment for Eielson F-35 squadron, including classrooms, maintenance hanger and engine repair training
Environmental Control Unit replacement and addition to aging facility at Fort Greely. This facility is operated by the Missile Defense Agency
Environmental Control Unit replacement and addition to aging facility at Eareckson Air Force Station in Shemya. This facility is operated by the Missile Defense Agency
Installed FAVERS (Fire Apparatus Vehicle Exhaust Removal System) to fire station with 8 bays
Installed FAVERS (Fire Apparatus Vehicle Exhaust Removal System) to fire station with 4 bays
Complete Renovation of barracks facilities at Fort Wainwright, completed in 2016
Complete Renovation of Child Care facility at Fort Wainwright, completed in 2017
HVAC upgrades and repairs of barracks facility at Fort Wainwright, completed in 2017
New 20,000 sqft Battalion Headquarters facility at Fort Wainwright, completed in 2016
New 30,000 sqft Company Operations facility at Fort Wainwright, completed in 2016
Restaurant / Commercial Kitchen >>>
The new Food Factory Restaurant was built in 2016
New Restaurant and kitchen was built after the historic Sourdough Sam’s Restaurant caught fire in 2009
UAF Food Court with multiple cooking and serving areas, completed in 2015
Small Kitchen near downtown Fairbanks that serves those in need of a warm meal
Upscale Sushi and Japanese restaurant on South Cushman, completed in 2019
Repair and partial replacement of 2 separate kitchens at Clear Air Force Station. Work Completed in 2019
Various repairs, upgrades and replacements of approx. 10 separate kitchens on Fort Wainwright. Work completed in 2018
Data Room Cooling >>>
Installed Data Room cooling system for secure vault in 2017
Installed Data Room cooling system for secure data room in 2017
Environmental Control Unit replacement and upgrades to aging facility at Fort Greely. This facility is operated by the Missile Defense Agency. Work Completed 2018
Data room cooling for IT room at Fairbanks Memorial Hospital Surgery Center
Research location operated by the Institute of Arctic Biology at the University of Alaska Fairbanks. This facility is on Toolik Lake approx. 120 miles south of Prudhoe Bay
Small remote health clinic for the village of Allakaket
Remodel and addition to existing K-12 school in the village of Ruby. Completed in 2013
New construction of Manley Airport Warm Storage Facility in 2016